Bristol-Myers Squibb Company and Celgene Corporation, In the Matter of

Duties42in this order
Parties bound2as written in the order
Order date20209 January, printed in the order
Last end date20309 January 2030, worked out from the order
Forum
FTC administrative order, Federal Trade Commission
Docket
C-4690
Order date
2020-01-09 (printed in the order)
Status in the FTC case catalog
Entered or issued, listed on the case page under 2020-01-13
Length of the order
Until 2030-01-09 (date stated in the order)
Source
Order text (PDF, ftc.gov) | FTC case page
Source file sha256
b38bb20961fc9beb3ce3be4d5f93ca3619890c1215ee6fd4fd5a3ae6d4c783de
Where the 42 duties stand
  • In force 21
  • Due date not public 16
  • No public record of completion found 5

Most compliance is reported privately and never published. No public record does not mean a duty was not met. What each status means.

Parties bound, as written in the order

  • Bristol-Myers Squibb Company Respondent, DE430 East 29th Street, 14th Floor, New York, New York 10016
  • Celgene Corporation Respondent, DE86 Morris Avenue, Summit, New Jersey 07901
Fig. 01 – the clock on this order

Every dated duty, on one line each.

12 of 42 duties are drawn. The others have no date that can be worked out from the public record, or no clock at all.

202020212022202320242025202620272028202920302031II.I: Respondents may not use, register, or challenge the Acquirer's use of the Otezla trademarks or confusingly similar marks in the United States, except as agreed for selling transition inventory. (2020-01-09 to 2030-01-09)II.IRespondents may not use…II.J: Respondents may not bring or maintain patent suits against Otezla Releasees that would limit the Acquirer's freedom to research, develop, make or sell Otezla Products. (2020-01-09 to 2030-01-09)II.JRespondents may not bring or…II.K: On the Acquirer's written request, Respondents must provide knowledgeable employees, at no more than Direct Cost, to help defend third-party litigation over the Otezla Intellectual Property. (2020-01-09 to 2030-01-09)II.KOn the Acquirer's written…II.L: For patent suits filed or prepared as of the Divestiture Date, Respondents must cooperate with the Acquirer, waive conflicts for outside counsel, and transfer litigation files. (2020-01-09 to 2030-01-09)II.LFor patent suits filed or…III.B-C: Respondents must reference the Order in the divestiture agreements and may not modify or amend them without prior Commission approval. (2020-01-09 to 2030-01-09)III.B-CRespondents must reference…VI.A: Respondents must deliver all Otezla Confidential Business Information to the Acquirer promptly, restrict its use and disclosure, set up access controls, and maintain firewalls. (2020-01-09 to 2030-01-09)VI.ARespondents must deliver all…VI.B: Respondents must require employees with Otezla marketing or sales responsibilities, and their supervisors, to sign confidentiality agreements as a condition of continued employment. (2020-01-09 to 2030-01-09)VI.BRespondents must require…VI.D: Respondents must ensure their own counsel does not retain unredacted copies of materials given to the Acquirer, except for stated compliance and litigation purposes. (2020-01-09 to 2030-01-09)VI.DRespondents must ensure their…VII.B: Respondents may not sell, transfer, encumber or otherwise impair the Otezla Assets, other than as the Order prescribes. (2020-01-09 to 2030-01-09)VII.BRespondents may not sell…XII: Respondents must notify the Commission at least 30 days before any proposed dissolution, acquisition, merger or consolidation of BMS or Celgene, or other change that might affect compliance. (2020-01-09 to 2030-01-09)XIIRespondents must notify the…XIII: On written request and 5 days' notice, each Respondent must permit Commission representatives to inspect facilities and records and to interview officers, directors or employees. (2020-01-09 to 2030-01-09)XIIIOn written request and 5 days'…XV: The Order terminates on January 9, 2030. (2020-01-09 to 2030-01-09)XVThe Order terminates on January…TODAY

Scroll sideways to see the whole chart ›

  • Continuing duty, from start to end
  • Today

Duties (42)

II.ADivestiture

II.A: Divestiture. Not later than 10 days after the Acquisition Date, Respondents must divest the Otezla Assets to Amgen, absolutely and in good faith, under the Otezla Divestiture Agreements.

Not later than ten (10) days after the Acquisition Date, Respondents shall divest the Otezla Assets, absolutely and in good faith, to Amgen pursuant to, and in accordance with, the Otezla Divestiture Agreements.

Quoted from the order text (PDF), clause II.A.

Who
Respondents
When
Due 10 days, counted from the event “Acquisition Date”; date not public
Status
Due date not public. The order sets a deadline counted from a date or event that is not public, such as an effective date, a date of service or a divestiture, so the due date cannot be worked out and is not shown as passed.
Due date not public No fixed date Source PDF ↗
II.CRequired action

II.C: Required action. Respondents must grant the Acquirer a perpetual, non-exclusive, royalty-free, irrevocable license to Product Manufacturing Technology for Otezla Products not otherwise assigned to it.

Respondents shall grant to the Acquirer a perpetual, non-exclusive, fully paid-up, irrevocable, and royalty-free license to all Product Manufacturing Technology related to the Otezla Products

Quoted from the order text (PDF), clause II.C.

Who
Respondents
When
No one-time deadline
Status
No public record of completion found. We have not found a public record showing this duty being carried out. Most compliance is reported privately to the agency and never published, so the absence of a public record does not mean the duty was not met.
No public record of completion found No fixed date Source PDF ↗
II.DDivestiture

II.D: Divestiture. If the Commission finds Amgen or the manner of divestiture unacceptable when making the Order final, Respondents must rescind and re-divest within 180 days after the Order Date, or make the changes the Commission directs.

Respondents shall immediately rescind the transaction with Amgen as directed by the Commission, and shall divest the Otezla Assets within one hundred eighty (180) days after the Order Date

Quoted from the order text (PDF), clause II.D.

Who
Respondents
When
Due 180 days, counted from the event “Order Date”; date not public
Status
Due date not public. The order sets a deadline counted from a date or event that is not public, such as an effective date, a date of service or a divestiture, so the due date cannot be worked out and is not shown as passed.
Due date not public No fixed date Source PDF ↗
II.ERequired action

II.E: Required action. Before the Divestiture Date, Respondents must give the Acquirer the opportunity to review all Otezla Contracts.

Prior to the Divestiture Date, Respondents shall provide the Acquirer with the opportunity to review all Otezla Contracts

Quoted from the order text (PDF), clause II.E.

Who
Respondents
When
Due by the event “Divestiture Date”; date not public
Status
Due date not public. The order sets a deadline counted from a date or event that is not public, such as an effective date, a date of service or a divestiture, so the due date cannot be worked out and is not shown as passed.
Due date not public No fixed date Source PDF ↗
II.FRequired action

II.F: Required action. Before the Divestiture Date, Respondents must secure all third-party consents and waivers needed to divest the Otezla Assets, or certify the Acquirer has signed them directly.

Prior to the Divestiture Date, Respondents shall secure all consents and waivers from all non-governmental third parties that are necessary to permit Respondents to divest the Otezla Assets

Quoted from the order text (PDF), clause II.F.

Who
Respondents
When
Due by the event “Divestiture Date”; date not public
Status
Due date not public. The order sets a deadline counted from a date or event that is not public, such as an effective date, a date of service or a divestiture, so the due date cannot be worked out and is not shown as passed.
Due date not public No fixed date Source PDF ↗
II.G(1)Required action

II.G(1): Required action. Respondents must provide the Acquirer all Product Manufacturing Technology for Otezla Products, and all rights to third-party-owned technology licensed to a Respondent, under the Technology Transfer Standards.

Respondents shall provide, or cause to be provided, to the Acquirer in a manner consistent with the Technology Transfer Standards:

Quoted from the order text (PDF), clause II.G(1).

Who
Respondents
When
No one-time deadline
Status
No public record of completion found. We have not found a public record showing this duty being carried out. Most compliance is reported privately to the agency and never published, so the absence of a public record does not mean the duty was not met.
No public record of completion found No fixed date Source PDF ↗
II.G(2)Required action

II.G(2): Required action. Not later than 10 days after the Divestiture Date, Respondents must release third parties bound by agreements that limit technology transfer to the Acquirer.

Not later than ten (10) days after the Divestiture Date, Respondents shall grant a release to each third party that is subject to such agreements

Quoted from the order text (PDF), clause II.G(2).

Who
Respondents
When
Due 10 days, counted from the event “Divestiture Date”; date not public
Status
Due date not public. The order sets a deadline counted from a date or event that is not public, such as an effective date, a date of service or a divestiture, so the due date cannot be worked out and is not shown as passed.
Due date not public No fixed date Source PDF ↗
II.G(3)Required action

II.G(3): Required action. Within 5 days of executing each such release, Respondents must give a copy to the Acquirer.

Within five (5) days of the execution of each such release, Respondents shall provide a copy of the release to the Acquirer.

Quoted from the order text (PDF), clause II.G(3).

Who
Respondents
When
Due 5 days, counted from the event “execution of each release”; date not public
Status
Due date not public. The order sets a deadline counted from a date or event that is not public, such as an effective date, a date of service or a divestiture, so the due date cannot be worked out and is not shown as passed.
Due date not public No fixed date Source PDF ↗
II.HRequired action

II.H: Required action. Respondents must designate employees knowledgeable about Otezla marketing, distribution, warehousing and sales to help the Acquirer transfer and integrate the business.

Respondents shall designate employees of Respondents knowledgeable about the marketing, distribution, warehousing, and sale related to the Otezla Products to assist the Acquirer

Quoted from the order text (PDF), clause II.H.

Who
Respondents
When
No one-time deadline
Status
No public record of completion found. We have not found a public record showing this duty being carried out. Most compliance is reported privately to the agency and never published, so the absence of a public record does not mean the duty was not met.
No public record of completion found No fixed date Source PDF ↗
II.IProhibition

II.I: Prohibition. Respondents may not use, register, or challenge the Acquirer's use of the Otezla trademarks or confusingly similar marks in the United States, except as agreed for selling transition inventory.

challenge or interfere with an Acquirer's use and registration of the

Quoted from the order text (PDF), clause II.I.

Who
Respondents
When
No one-time deadline
How long
Until 2030-01-09 (date stated in the order)
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force Until 2030-01-09 Source PDF ↗
II.JProhibition

II.J: Prohibition. Respondents may not bring or maintain patent suits against Otezla Releasees that would limit the Acquirer's freedom to research, develop, make or sell Otezla Products.

Respondents shall not join, file, prosecute, or maintain any suit, in law or equity, against the Otezla Releasees under any Patent that was pending or issued on or before the Acquisition Date

Quoted from the order text (PDF), clause II.J.

Who
Respondents
When
No one-time deadline
How long
Until 2030-01-09 (date stated in the order)
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force Until 2030-01-09 Source PDF ↗
II.KCooperation

II.K: Cooperation. On the Acquirer's written request, Respondents must provide knowledgeable employees, at no more than Direct Cost, to help defend third-party litigation over the Otezla Intellectual Property.

Respondents shall provide, in a timely manner, at no greater than Direct Cost, assistance of knowledgeable employees of Respondents

Quoted from the order text (PDF), clause II.K.

Who
Respondents
When
No one-time deadline
How long
Until 2030-01-09 (date stated in the order)
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force Until 2030-01-09 Source PDF ↗
II.LCooperation

II.L: Cooperation. For patent suits filed or prepared as of the Divestiture Date, Respondents must cooperate with the Acquirer, waive conflicts for outside counsel, and transfer litigation files.

cooperate with the Acquirer and provide any and all necessary technical and legal assistance, documentation, and witnesses from that Respondent in connection with obtaining resolution of such patent infringement suit;

Quoted from the order text (PDF), clause II.L.

Who
Respondents
When
No one-time deadline
How long
Until 2030-01-09 (date stated in the order)
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force Until 2030-01-09 Source PDF ↗
III.B-CProhibition

III.B-C: Prohibition. Respondents must reference the Order in the divestiture agreements and may not modify or amend them without prior Commission approval.

Respondents shall not modify or amend any of the terms of any Otezla Divestiture Agreement without the prior approval of the Commission

Quoted from the order text (PDF), clause III.B-C.

Who
Respondents
When
No one-time deadline
How long
Until 2030-01-09 (date stated in the order)
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force Until 2030-01-09 Source PDF ↗
IV.ARequired action

IV.A: Required action. At the Acquirer's request and with Commission approval, Respondents must provide transition services sufficient to run the Otezla Business as before, at no more than Direct Cost.

Respondents shall provide transition services sufficient to enable the Acquirer to operate the Otezla Business in substantially the same manner that Respondents have operated the Otezla Business prior to the Acquisition Date.

Quoted from the order text (PDF), clause IV.A.

Who
Respondents
When
No one-time deadline
How long
Runs until the event “completion of Transition Manufacturing for the Acquirer”; date not public
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force No fixed date Source PDF ↗
IV.B-CRequired action

IV.B-C: Required action. On the Acquirer's request, Respondents must manufacture and supply Otezla Products at Supply Cost: 24 months for finished dosage (plus two 6-month options) and 18 months for active ingredient (plus two 6-month options), at the Acquirer's option.

Respondents shall Transition Manufacture and deliver, or cause to be manufactured and delivered, to the Acquirer, in a timely manner and under reasonable terms and conditions, a supply of each of the Transition Manufacture Products at Supply Cost.

Quoted from the order text (PDF), clause IV.B-C.

Who
Respondents
When
No one-time deadline
How long
Runs 24 months, counted from the event “start of the Transition Manufacturing contract”; date not public
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force No fixed date Source PDF ↗
IV.D-GRequired action

IV.D-G: Required action. Respondents must give warranties and indemnities on supplied product, give the Acquirer supply priority, and indemnify for late-delivery losses unless the failure was beyond their control and cured within 30 days.

Respondents shall make representations and warranties to the Acquirer that the Transition Manufacture Product(s) supplied by Respondents meet the relevant Agency-approved specifications.

Quoted from the order text (PDF), clause IV.D-G.

Who
Respondents
When
No one-time deadline
How long
Runs until the event “term of any agreement to Transition Manufacture”; date not public
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force No fixed date Source PDF ↗
IV.H-MRequired action

IV.H-M: Required action. During any Transition Manufacturing agreement, Respondents must provide records and cost information, ensure uninterrupted supply, not terminate for Acquirer breach or bankruptcy, allow termination without penalty, and provide consultation and training.

Respondents shall take all actions as are reasonably necessary to ensure an uninterrupted supply of the Transition Manufacture Product(s).

Quoted from the order text (PDF), clause IV.H-M.

Who
Respondents
When
No one-time deadline
How long
Runs until the event “term of any agreement to Transition Manufacture”; date not public
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force No fixed date Source PDF ↗
V.A(1)Required action

V.A(1): Required action. For 6 months after Transition Manufacturing ends (manufacturing staff) and 1 year after the Divestiture Date (other core employees), Respondents must give the Acquirer the opportunity to enter employment contracts with Otezla Core Employees.

provide the Acquirer or its Manufacturing Designee with the opportunity to enter into employment contracts with the Otezla Manufacturing Employees

Quoted from the order text (PDF), clause V.A(1).

Who
Respondents
When
No one-time deadline
How long
Runs 1 year, counted from the event “Divestiture Date”; date not public
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force No fixed date Source PDF ↗
V.A(2)Required action

V.A(2): Required action. Respondents must give the Acquirer Product Employee Information within 10 days of Commission staff notice or an Acquirer request, whichever is earlier.

provide the Acquirer or Proposed Acquirer(s) with the Product Employee Information related to the Otezla Core Employees not later than the earlier of the following dates:

Quoted from the order text (PDF), clause V.A(2).

Who
Respondents
When
Due 10 days, counted from the event “notice by Commission staff or written request by an Acquirer, whichever is earlier”; date not public
Status
Due date not public. The order sets a deadline counted from a date or event that is not public, such as an effective date, a date of service or a divestiture, so the due date cannot be worked out and is not shown as passed.
Due date not public No fixed date Source PDF ↗
V.A(3-4)Required action

V.A(3-4): Required action. Respondents must not interfere with the Acquirer hiring Otezla Core Employees, must remove impediments such as non-competes, and must give financial incentives to stay until the Divestiture Date.

not interfere with the hiring or employing by the Acquirer or its Manufacturing Designee of the Otezla Core Employees

Quoted from the order text (PDF), clause V.A(3-4).

Who
Respondents
When
No one-time deadline
How long
Runs until the event “end of the Otezla Core Employee Access Period or the Divestiture Date”; date not public
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force No fixed date Source PDF ↗
V.BProhibition

V.B: Prohibition. For one year after the Divestiture Date, Respondents may not solicit employees of the Acquirer or its Manufacturing Designee who have responsibility for an Otezla Product, subject to stated exceptions.

Respondents shall not, directly or indirectly, solicit any employee of the Acquirer or its Manufacturing Designee

Quoted from the order text (PDF), clause V.B.

Who
Respondents
When
No one-time deadline
How long
Runs 1 year, counted from the event “Divestiture Date”; date not public
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force No fixed date Source PDF ↗
VI.ARequired action

VI.A: Required action. Respondents must deliver all Otezla Confidential Business Information to the Acquirer promptly, restrict its use and disclosure, set up access controls, and maintain firewalls.

transfer and deliver to the Acquirer, at Respondents' expense, all Otezla Confidential Business Information;

Quoted from the order text (PDF), clause VI.A.

Who
Respondents
When
No one-time deadline
How long
Until 2030-01-09 (date stated in the order)
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force Until 2030-01-09 Source PDF ↗
VI.BRequired action

VI.B: Required action. Respondents must require employees with Otezla marketing or sales responsibilities, and their supervisors, to sign confidentiality agreements as a condition of continued employment.

Respondents shall require, as a condition of continued employment post-divestiture of the Otezla Assets, that each employee that has had responsibilities related to the marketing or sales of the Otezla Products

Quoted from the order text (PDF), clause VI.B.

Who
Respondents
When
No one-time deadline
How long
Until 2030-01-09 (date stated in the order)
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force Until 2030-01-09 Source PDF ↗
VI.CNotice

VI.C: Notice. Not later than 30 days after the Divestiture Date, Respondents must email employees notice of the confidentiality restrictions, keep receipts for 2 years and certify to the Commission.

Not later than thirty (30) days after the Divestiture Date, Respondents shall provide written notification of the restrictions on the use and disclosure of the Otezla Confidential

Quoted from the order text (PDF), clause VI.C.

Who
Respondents (reports to: Commission)
When
Due 30 days, counted from the event “Divestiture Date”; date not public
Status
Due date not public. The order sets a deadline counted from a date or event that is not public, such as an effective date, a date of service or a divestiture, so the due date cannot be worked out and is not shown as passed.
Due date not public No fixed date Source PDF ↗
VI.DRequired action

VI.D: Required action. Respondents must ensure their own counsel does not retain unredacted copies of materials given to the Acquirer, except for stated compliance and litigation purposes.

Each Respondent shall assure that its own counsel (including its own in-house counsel under appropriate confidentiality arrangements) shall not retain unredacted copies of documents or other materials provided to an Acquirer

Quoted from the order text (PDF), clause VI.D.

Who
Respondents
When
No one-time deadline
How long
Until 2030-01-09 (date stated in the order)
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force Until 2030-01-09 Source PDF ↗
VII.ARequired action

VII.A: Required action. Until the Otezla Assets and related technology and clinical trials are fully delivered to the Acquirer, Respondents must maintain the assets' viability, prevent their deterioration and avoid disrupting regulatory approvals.

Respondents shall take actions as are necessary to: 1. maintain the full economic viability and marketability of the Otezla Assets;

Quoted from the order text (PDF), clause VII.A.

Who
Respondents
When
No one-time deadline
How long
Runs until the event “full transfer and delivery of the Otezla Assets, Product Manufacturing Technology and Clinical Trials to the Acquirer”; date not public
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force No fixed date Source PDF ↗
VII.BProhibition

VII.B: Prohibition. Respondents may not sell, transfer, encumber or otherwise impair the Otezla Assets, other than as the Order prescribes.

Respondents shall not sell, transfer, encumber, or otherwise impair the Otezla Assets

Quoted from the order text (PDF), clause VII.B.

Who
Respondents
When
No one-time deadline
How long
Until 2030-01-09 (date stated in the order)
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force Until 2030-01-09 Source PDF ↗
VIIICooperation

VIII: Cooperation. For Clinical Trials ongoing at the Divestiture Date, Respondents must designate liaison staff, coordinate protocols, assist with clinical plans, prepare a transfer plan and give assistance consistent with Good Clinical Practice.

with respect to any ongoing Clinical Trial(s) as of the Divestiture Date related to the Otezla Products, Respondents shall:

Quoted from the order text (PDF), clause VIII.

Who
Respondents
When
No one-time deadline
Status
No public record of completion found. We have not found a public record showing this duty being carried out. Most compliance is reported privately to the agency and never published, so the absence of a public record does not mean the duty was not met.
No public record of completion found No fixed date Source PDF ↗
IX.BAssessment or monitor

IX.B: Assessment or monitor. Not later than one day after the Acquisition Date, Respondents must confer on the Monitor all rights, powers and authorities needed to monitor compliance.

Not later than one (1) day after the Acquisition Date, Respondents shall confer on the Monitor all rights, powers, and authorities necessary

Quoted from the order text (PDF), clause IX.B.

Who
Respondents
When
Due 1 day, counted from the event “Acquisition Date”; date not public
Status
Due date not public. The order sets a deadline counted from a date or event that is not public, such as an effective date, a date of service or a divestiture, so the due date cannot be worked out and is not shown as passed.
Due date not public No fixed date Source PDF ↗
IX.C-HAssessment or monitor

IX.C-H: Assessment or monitor. Respondents must give the Monitor (Quantic Regulatory Services, LLC) access to information, personnel and facilities, cooperate, pay the Monitor's costs and indemnify the Monitor; the Monitor's service runs until Transition Manufacturing is complete and not more than 4 years after the Order Date unless extended.

shall cooperate with any reasonable request of the Monitor and shall take no action to interfere with or impede the Monitor's ability to monitor

Quoted from the order text (PDF), clause IX.C-H.

Who
Respondents
When
No one-time deadline
How long
Runs 4 years, counted from the event “Order Date”; date not public
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force No fixed date Source PDF ↗
IX.K(2)Assessment or monitor

IX.K(2): Assessment or monitor. If the Commission appoints a substitute Monitor, Respondents must execute an agreement conferring the necessary powers within 10 days of the appointment.

not later than ten (10) days after the Commission's appointment of the substitute Monitor, Respondents shall execute an agreement

Quoted from the order text (PDF), clause IX.K(2).

Who
Respondents
When
Due 10 days, counted from the event “Commission's appointment of a substitute Monitor”; date not public
Status
Due date not public. The order sets a deadline counted from a date or event that is not public, such as an effective date, a date of service or a divestiture, so the due date cannot be worked out and is not shown as passed.
Due date not public No fixed date Source PDF ↗
X.CAssessment or monitor

X.C: Assessment or monitor. If a Divestiture Trustee is appointed, Respondents must execute a trust agreement within 10 days of the appointment.

Not later than ten (10) days after the appointment of a Divestiture Trustee, Respondents shall execute a trust agreement

Quoted from the order text (PDF), clause X.C.

Who
Respondents
When
Due 10 days, counted from the event “appointment of a Divestiture Trustee”; date not public
Status
Due date not public. The order sets a deadline counted from a date or event that is not public, such as an effective date, a date of service or a divestiture, so the due date cannot be worked out and is not shown as passed.
Due date not public No fixed date Source PDF ↗
X.DAssessment or monitor

X.D: Assessment or monitor. If a Divestiture Trustee is appointed, Respondents must give the trustee access and cooperation, pay the trustee's costs, indemnify the trustee, and select among approved acquirers within 5 days.

Respondents shall develop such financial or other information as the Divestiture Trustee may request and shall cooperate with the Divestiture Trustee.

Quoted from the order text (PDF), clause X.D.

Who
Respondents
When
No one-time deadline
Status
No public record of completion found. We have not found a public record showing this duty being carried out. Most compliance is reported privately to the agency and never published, so the absence of a public record does not mean the duty was not met.
No public record of completion found No fixed date Source PDF ↗
XI.ANotice

XI.A: Notice. Not later than 5 days after the Acquisition Date, Respondents must notify Commission staff of the Acquisition Date.

Not later than five (5) days after the Acquisition Date, Respondents shall notify Commission staff of the Acquisition Date

Quoted from the order text (PDF), clause XI.A.

Who
Respondents (reports to: Commission)
When
Due 5 days, counted from the event “Acquisition Date”; date not public
Status
Due date not public. The order sets a deadline counted from a date or event that is not public, such as an effective date, a date of service or a divestiture, so the due date cannot be worked out and is not shown as passed.
Due date not public No fixed date Source PDF ↗
XI.BNotice

XI.B: Notice. Not later than 5 days after the Divestiture Date, Respondents must notify Commission staff of the Divestiture Date.

Not later than five (5) days after the Divestiture Date, Respondents shall notify Commission staff of the Divestiture Date

Quoted from the order text (PDF), clause XI.B.

Who
Respondents (reports to: Commission)
When
Due 5 days, counted from the event “Divestiture Date”; date not public
Status
Due date not public. The order sets a deadline counted from a date or event that is not public, such as an effective date, a date of service or a divestiture, so the due date cannot be worked out and is not shown as passed.
Due date not public No fixed date Source PDF ↗
XI.CReporting

XI.C: Reporting. Not later than 30 days after the Divestiture Date, Respondents must submit complete copies of all Divestiture Agreements to the Commission.

Respondents shall submit complete copies of all of the Divestiture Agreements to the Secretary of the Commission

Quoted from the order text (PDF), clause XI.C.

Who
Respondents (reports to: Commission)
When
Due 30 days, counted from the event “Divestiture Date”; date not public
Status
Due date not public. The order sets a deadline counted from a date or event that is not public, such as an effective date, a date of service or a divestiture, so the due date cannot be worked out and is not shown as passed.
Due date not public No fixed date Source PDF ↗
XI.DReporting

XI.D: Reporting. Within 30 days after the Order Date and every 90 days thereafter until the transfers and Transition Manufacturing are complete, Respondents must submit verified compliance reports to the Commission and the Monitor.

Within thirty (30) days after the Order Date, and every ninety (90) days thereafter until Respondents have completed all of the following:

Quoted from the order text (PDF), clause XI.D.

Who
Respondents (reports to: Commission and Monitor)
When
Due 30 days, counted from the event “Order Date”; date not public
How long
Runs until the event “completion of asset transfer, technology transfer, confidential information delivery and Transition Manufacturing”; date not public
Repeats
Every 90 days
Status
Due date not public. The order sets a deadline counted from a date or event that is not public, such as an effective date, a date of service or a divestiture, so the due date cannot be worked out and is not shown as passed.
Due date not public No fixed date Source PDF ↗
XI.EReporting

XI.E: Reporting. One year after the Order Date, annually for the next nine years, and at other times the Commission requires, Respondents must file a verified compliance report.

One (1) year after the Order Date, annually for the next nine (9) years on the anniversary of the Order Date, and at other times as the Commission may require

Quoted from the order text (PDF), clause XI.E.

Who
Respondents (reports to: Commission)
When
Due 1 year, counted from the event “Order Date”; date not public
How long
Runs 10 years, counted from the event “Order Date”; date not public
Repeats
Every 1 year
Status
Due date not public. The order sets a deadline counted from a date or event that is not public, such as an effective date, a date of service or a divestiture, so the due date cannot be worked out and is not shown as passed.
Due date not public No fixed date Source PDF ↗
XIINotice

XII: Notice. Respondents must notify the Commission at least 30 days before any proposed dissolution, acquisition, merger or consolidation of BMS or Celgene, or other change that might affect compliance.

Respondents shall notify the Commission at least thirty (30) days prior to:

Quoted from the order text (PDF), clause XII.

Who
Respondents (reports to: Commission)
When
No one-time deadline
How long
Until 2030-01-09 (date stated in the order)
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force Until 2030-01-09 Source PDF ↗
XIIICooperation

XIII: Cooperation. On written request and 5 days' notice, each Respondent must permit Commission representatives to inspect facilities and records and to interview officers, directors or employees.

upon written request, and upon five (5) days' notice to a Respondent made to its principal United States offices

Quoted from the order text (PDF), clause XIII.

Who
Respondents
When
No one-time deadline
How long
Until 2030-01-09 (date stated in the order)
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force Until 2030-01-09 Source PDF ↗
XVTerm of the order

XV: Term of the order. The Order terminates on January 9, 2030.

IT IS FURTHER ORDERED that this Order shall terminate on January 9, 2030.

Quoted from the order text (PDF), clause XV.

Who
Respondents
When
No one-time deadline
How long
Until 2030-01-09 (date stated in the order)
Status
In force. The order requires this for as long as its stated period runs. This says nothing about whether it is being followed.
In force Until 2030-01-09 Source PDF ↗